Earthworks and civil engineering

We provide for the preparation of complete construction excavations, also under difficult conditions. With our modern logistics and our highly-developed technology, we can excavate and transport 100.000 m³ or more soil in a short period of time.

Click to enlarge the picture!
Olympic Stadium Berlin - playing field lowering

Olympic Stadium Berlin - playing field lowering

85.000 m³ excavated material, 22.000 m³ backfilling, 2000 m² sheeting, implementation of the main work performance in only 23 calendar days

Click to enlarge the picture!
Olympic Stadium Berlin - VIP rostrum

 

Olympic Stadium Berlin - VIP rostrum, in joint venture

90.000 m³ excavated material, 28.000 m³ backfilling, construction pit excavated up to 19 m depth

Click to enlarge the picture!
Olympic Stadium Berlin - warm-up hall
 

Olympic Stadium Berlin - warm-up hall/construction pit West Marathontor, in joint venture

80.000 m³ excavated material, 14.000 m³ backfilling, construction pit excavated up to 12 m depth

Click to enlarge the picture!
Olympic Stadium Berlin - underground
garage

 

Olympic Stadium Berlin - underground garage and VIP area south, in joint venture

Underground garage 102.000 m³ excavated material and VIP area 33.000 m³ excavation up to 10 m deep

Click to enlarge the picture!
Olympic Stadium Berlin - technology
central station
 

Olympic Stadium Berlin - technology central station in the northern-southern region, in joint venture

12.000 m³ excavated material, construction pit up to 8 m depth

 

top of pagetop of page
Click to enlarge the picture!
Kaiserbahnhof
 

Kaiserbahnhof railway station Potsdam

Manufacture of a construction pit, partially under the railway station building, for an auditorium, a seminar room and an ICE simulator for German Railways Deutsche Bahn AG, 25.000 m³ excavated material, of which 2.000 m³ under the existing building

Click to enlarge the picture!
Beisheimcenter
 

Beisheimcenter Berlin

Excavated material from two construction pits with a total of 130.000 m³ with 12 m depth

Click to enlarge the picture!
Waste dump remediation
 

Waste dump remediation in the State of Brandenburg - Kleinmachnow

Pre-profiling and compression, installation of a seal including film covering and grass placement, laying of utility ducting and drainage

Click to enlarge the picture!
Dike remediation
  Dike remediation in the State of Brandenburg - Oderdeiche