| Environmental technology |
| 
|
With
their environmental technology department, Gebrüder Kemmer
GmbH has had the capability to guarantee recovery and waste
disposal of dangerous and polluting materials according to
specification. We provide for the protection and remediation
of asbestos, PCB, PAK, CHC, heavy metals and similar contaminated
buildings, areas and waters. |

Remediation of a waste dump in
Rheinsberg |
State of Brandenburg - remediation of a waste dump in Rheinsberg
Back construction and waste disposal of a wild domestic refuse
deposition in a former railroad cutting, 48.000 m³ reclamation |

Potsdam gasworks |
Potsdam gasworks
Boring of contaminated ground to 8 m depth in ground water
saturated area through overlapped large-scale boring with
concurrent ground water cleaning 5.000 m³ |

Heilig Geist Kapelle
|
Berlin - Heilig Geist Kapelle
Decontamination of a roof frame treated with wood preservatives
(DDT, lindane, PCP) in the course of the remediation of the
chapel which is classified as an historical monument
|

Stadtpalais Potsdam |
Stadtpalais Potsdam
Demolition of a former department store with prior removal
of pollutants and waste disposal, retention of the facade
classified as historical monument and the inner court, 55.000
m³ enclosed space |

Werder gasworks |
Werder gasworks
Subsoil rubble clearance and waste disposal of contaminated
ground on the former gasworks grounds on Werder island, 4.000
m³ excavated material |

Fiber works Premnitz |
Remediation of fiber works Premnitz
Restoration and development of an industrial area, excavated
material and intermediate storage of 19.000 m³ contaminated
soil, waste disposal of 10.000 m³ special refuse |

City hall promenade Berlin |
City hall promenade Berlin
Decontamination of open spaces and a playground as an immediate
action to counter the danger after an accident with weed destruction
agent |

Palace of the Republic |
Berlin - Palace of the Republic, asbestos removal in joint
venture
Removal of sprayed asbestos as fire protection at a steel
framing construction on a surface of 172.000 m², 638.000
m³ enclosed space |
top
of page |